110 MW Solar Project: Greenfield Substation and Transmission Line Design
Client Challenge A renewable energy developer required engineering and permitting support to launch a 110 MW solar facility, including a greenfield collector substation and transmission line upgrades connecting to the utility interconnect substation. The project needed a partner capable of managing the design from concept to construction while addressing a non-standard interconnection requirement. How We Helped SGC Power was selected through a competitive bid to deliver the c
Apr 11


Design Support for Major System Upgrade for Renewable Power Integration
Client Challenge Our client is a leading renewable energy company that designs, develops, manages, and operates power plants. Our client required additional infrastructure to deliver renewable power to the utility grid. For this interconnection, a collector system, collector substation, and transmission line needed to be designed and constructed. How We Helped SGC Power completed the collector system, collector substation, transmission line designs, and the local utility inte
Sep 16, 2024


Major Substation Upgrade for Large Sustainable Energy Company
Client Challenge In an initiative to improve area reliability on the local distribution system, our client commissioned this substation upgrade project to support a new 34kV distribution feeder out of an existing 115kV switching station. This new feeder allowed an existing distribution circuit to be sectionalized, thus reducing the overall circuit length. Tie capability was also added for additional reliability and maintenance flexibility. Before this project, this substati
Sep 16, 2024


Delivering Renewable Power to the Utility Grid
Client Challenge Our client required additional infrastructure to deliver renewable power to the utility grid. For this interconnection,...
Feb 6, 2023


Maximizing Performance an Overhauling a Local Substation Electrical System
Background Our client is a leading sustainable energy company with $38 billion in assets and operations in 24 U.S. states and has two primary lines of business: networks and renewables. They needed to build a 115/34.5/12.47kV substation which aimed to address power limiting contingencies, increase system stability, overall performance, and protection of the owner’s electrical system. The substation is comprised of: • One 115kV ring bus with four 115kV circuit breakers • Two 1